Friday, August 26, 2011

Day 123 - drywall on main floor done

Early On day 123, Kaylin left for work and Sheldon headed to the city to Chiropractor and to pick up Britt who had been staying with polox coach and taking in 2 practices. The Illingworths packed up and cleaned out their travel trailer and headed to the airport about 12:30. I spent the morning packing and visiting
In the afternoon we went out ot the ranch to see progress. On the way out we passed a familiar face who after 40 min was almost at the ranch

once there we found the main floor was completely dry walled



 and Rob brought out and installed the garage stairs
Rick the plumber had installed most of the heating loops for the tiled area upstairs

Julio had his meds and then Britt took him for a light conditioning ride to start preparing for nationals next weekend.
 here is updated photo while i changed the dressing, looks awesome, he is such a warrior
dirt was dumped in the sunken trenches and leveled

 Britt even moved a couple loads
Kaylin and Britt loaded some items needing to come to town :-)

The porta potty was starting to smell like the feedlots so we had to do a dump and move to new spot and refill with fresh water.

By now all were hungry so at 6 we made the voyage back to town for bar b q ribs and new potatoes. The evening was more tidying, organizing and errands to prepare for tomorrow.
seems Britt snapped a photo on my camera, interesting perspective.