 Day 129 came with sunshine but a breeze. Sheldon enjoyed the company golf team building day coming home with a bag of loot. I worked the morning and spent the afternoon picking up boxes from 3 places and then packing. What a daunting feeling right now looking around, 12 days and it all needs to be somewhere else!
After supper Sheldon came home and he, Britt and I headed out to the ranch to check progress. Britt took Julio for conditioning while we checked the house. The cabinet apprentice did work in the garage, finally we got in to see what has been happening in the garage

and the side mount lifts installed
Gienow was to replace transom above the deck doors but broke it on the way out so postponed until Monday the 12th
Mudding continued in the basement
















But the biggest surprise was the stucco going on, Blair thought not until Tuesday with the rain but here is one side









Sheldon and i loaded yet more boxes in the storage trailer, here are shots before we added todays load
 after a few days of rain totaling one full  inch the swimming pool is filled again
 B trots by on her route
 and someone thought it a good idea to back up in the septic test hole, hmmm bad idea
 the keypad and weather stripping installed
 and yes I will never tire of the sunsets out there
 here Britt is working on some pick up drills and loving the night
 I was trying different settings but loved the quirky action shots
 then i made them stand still, tell me why our grey horses love the mud after rain?
the warrior poses at dusk! another great evening at the ranch.. now tomorrow is work day!