Day 25 started the sunshine basement pony wall
center wall set up
pony wall going up NW corner
SW corner
looking from east side,
Sheldon started the day early with a hired man to tamp the back fill only to snap a chain on the skid-steer.. this foiled his day as he had planned
today the naughty puppies got into the tar!!! so they stepped on my capris, the carpet, the deck so TKO orange to the rescue. foot baths, clothing scrubbed, carpets scrubbed and fur cut away and it still was stuck in little paws.
Coco tries to wrestle her way out of Britt's death grip
Sunday, May 22, 2011
Wednesday, May 18, 2011
Day 24 - more wood
Day 24 - bit of rain, overcast and threatened more rain but Rob got more wood up
center wall built
convinced Zoe to come out on the ledge
now she says I'm outta here, this looks dangerous
view from the west side
floor joists waiting to be put to work
Sheldon fills the gas trench
Zoe is not sure how to cross the cavernous trench.. today was a dirty puppy bath after going to the ranch!
center wall built
convinced Zoe to come out on the ledge
now she says I'm outta here, this looks dangerous
view from the west side
floor joists waiting to be put to work
Sheldon fills the gas trench
Zoe is not sure how to cross the cavernous trench.. today was a dirty puppy bath after going to the ranch!
Day 23 - wood goes up
Day 23 Rob has power and gets the outside basement walls up
the many piles of dirt, gravel, clay and top soil landscape
the many piles of dirt, gravel, clay and top soil landscape
Day 22 - Power to the basement
Day 22 - Rob our framer started to build but had power issues from the pole so did not get started,
I was nominated "gopher" so off to the city I went for electrical supplies.
west wall
south wall
garage
north wall
Matt the electrician and Sheldon get to work to install the power panel
the first pile of lumber to start the house
success on the power!
the girls conditioned ponies while I fed but mosquitoes are the size of small sparrows and hungry like vampires! then Britt and I ran over to RJ for 4-H where Sheldon and Shaina joined us for a barbeque!
I was nominated "gopher" so off to the city I went for electrical supplies.
west wall
south wall
garage
north wall
Matt the electrician and Sheldon get to work to install the power panel
the first pile of lumber to start the house
success on the power!
the girls conditioned ponies while I fed but mosquitoes are the size of small sparrows and hungry like vampires! then Britt and I ran over to RJ for 4-H where Sheldon and Shaina joined us for a barbeque!
day 21 - trenching
Day 21 was a very busy day for trenching.
Our good friend Grant started at 10 am and trenched until 9 pm with just a lunch break.
heading to the water well
the basement was also waterproofed
to the power pole
Our good friend Grant started at 10 am and trenched until 9 pm with just a lunch break.
heading to the water well
the basement was also waterproofed
to the power pole
Monday, May 16, 2011
Day 20 - tree planting
Day 20 saw Britt and myself off to another 4-H horse show,
Sheldon stayed home and planted the 500 trees.
perhaps these are a little too close? I did suggest two rows of spruce but seems he was concentrating on efficient use of space.
yes they are wee but hope they take hold, they were the moldy things posted a few days back.
they are there.. I think.
Sheldon stayed home and planted the 500 trees.
perhaps these are a little too close? I did suggest two rows of spruce but seems he was concentrating on efficient use of space.
yes they are wee but hope they take hold, they were the moldy things posted a few days back.
they are there.. I think.
Saturday, May 14, 2011
Day 19 - Basement reveal
Day 19 bright and early they removed all the forms
south end -window to Kaylin's room
Sheldon asking where waterproofing should go up to
picture is a bit distorted as my stance on the dirt pile was a bit shaky :-)
then we headed to Calgary to drop girls at polocrosse practice
and we met with our designer lady Lisa and chose all flooring's and paint.. only took 3 hours!!
south end -window to Kaylin's room
Shaina's room window SW corner
rec room west sideSheldon asking where waterproofing should go up to
picture is a bit distorted as my stance on the dirt pile was a bit shaky :-)
then we headed to Calgary to drop girls at polocrosse practice
and we met with our designer lady Lisa and chose all flooring's and paint.. only took 3 hours!!
Subscribe to:
Posts (Atom)











