Friday, May 6, 2011

Day 10/11 - removed forms and fill with gravel

Day 10 was remove the forms, survey and snap the lines for foundation walls.

Day 11 Sheldon went out at 7 am to help. Lines were adjusted to square it up, weeping tile installed then the gravel was filled in for basement

We then headed to Calgary to make decisions on windows, plumbing fixtures etc. We ended up buying our Fireplace and 4 toilets then ran to Okotoks to get a very important fixture for the build

we looked funny driving the highways with a whole lot of toilet-ries! and yes there are 4- one piece dual flush toilets loaded in the truck along with Costco groceries, one toilet even rode in the porta potty.. :-)


Just to make sure it worked well
 Here is end gravel fill results and some frame set up

tomorrow is forming the basement for concrete.